Scheduled maintenance is currently in progress. We will provide updates as necessary.
Posted Aug 18, 2026 - 06:00 EDT
Scheduled
Maintenance Details: This release introduces enhancements to donor qualification, product release validation, and imported product processing to improve regulatory compliance, strengthen operational controls, and reduce manual intervention during donor and product management.
1. Order/Require Babesia Testing for Donor Requalification
Enhances donor qualification logic to automatically determine when Babesia testing is required during donor requalification based on the donor's reported testing history and prior test results.
2. Parvo Sample Program – Ready to Pack Validation Enhancements
Updates the Parvo Sample Program to prevent units from receiving a Ready to Pack status when required testing is incomplete, positive, or when SDR requirements have not been met.
3. Imported Product Labeling Fix
Resolves a production issue that prevented imported irradiated products from being relabeled, restoring the expected labeling workflow for imported products.
MAINTENANCE IMPACT: The following services may be temporarily unavailable for the duration of this maintenance: • EIS • IBBIS • Documentation Library
If you encounter issues relating to this maintenance, please report the problem to the Help Desk as described in procedure EMP.3.3 (Report a Computer or Network Issue). If this issue is critical, call the Help Desk at (352) 224-1685.
Posted Aug 14, 2026 - 11:10 EDT
This scheduled maintenance affected: IBBIS, EIS, and CASI.